In order to achieve SABINA targets, the project is divided into eight Work Packages (WPs), each targeting different objectives, tasks and expected results.


WP1 System specifications and requirements (led by SMS)


WP2 Building thermal inertia identification (led by UNAV)

  • WP2 covers simulation activities as well as building thermal identification methods development and improvement.


WP3 Management algorithms development (led by CSEM)

  • In WP3 activities connected with algorithms (e.g. production and consumption, building management) development will be performed.


WP4 Hardware adaptation and system integration (led by SCHE)

  • WP4 is dedicated to the system integration and validation before deployment on test sites.


WP5 Simulation and lab testing (led by IREC)

  • In WP5 the SABINA solution will be simulated and tested in laboratory’s conditions.


WP6 System validation at the test site (led by NTUA)


WP7 Dissemination, exploitation and standardization (led by AMI)


WP8 Project management and coordination of the consortium (led by SMS)

  • Proper project management is ensured within WP8.